Form interconnected system

Installation of network connection: for these systems is essential to have a connection to the electricity grid distribution near
Fill in all fields marked "Required" and all those who may be.

Contact information

Enter one of the following options (required)



Your name (required)

Company Name / Self (required)

Phone (required)

Su e-mail (required)







Plant data

1.- Installation location:

Province (required)

Population (required)

Country (required)



2.- Location of the solar field (fill all possible data which option you choose: 2.a, 2.b, 2.c o 2.d)

2.a.- On deck warehouse (urban or agricultural) neighbors or community:

Useful area

Deviation from south

Roof pitch



2.b.- On deck detached house:

Useful area

Deviation from south

Roof pitch



2.b.- In ground, in a land with urban cadastral reference (the structure must be used elsewhere, pergola, parking…):

Area available



2.c.- In ground, in a land without urban cadastral reference (solar plant):

Area available



Note

In the cases in the roof of the building there are several water, a "useful area" will be the water surface with better orientation South. If it's posible, take into account the existence of air conditioning machines, clarabollas,…, that will reduce the area available. The useful area will also be less if the cover receives shadow of a building, trees ...

3.- Electrical connection

Is there Rush?

Kind (monophasic, phase, own transformer,...)

Power (kW)








4.- Electric company

Name of the electricity company



5.- Nominal power of the installation to be installed or economic investment planned

Power (kW) (required)

Investment (MXN)


Observations